Assessments
The initiation of the assessment proces
The asssessment process started in 2017 to standardise grid connection in charging stations. Our goal? To connect only safe objects to the public grid. To accomplish this, grid operators have drawn up requirements that each object must meet. To check whether objects meet these requirements, a national assessment process has been set up. This is coordinated and facilitated by ElaadNL.
Since 2023, we not only inspect charging stations, but also unmanned objects. All approved objects will be certified and published. As shown above, the process consists of 10 stages. These are explained step by step in the grid operator assessment manual.

Certified objects
This page lists the objects that are currently approved.
View the certified objects
DSO- manual
This manual provides a complete guide to the grid operator’s approval for charging stations and unmanned objects. From preparation and technical requirements to required documentation, you will be taken through the process of the grid assessment step by step. Whether you are conducting an inspection for the first time or want to refresh your knowledge, this manual puts all the necessary information at your fingertips.
Download the grid assessment manual